亚洲伦理一区二区中文字幕,人妻精品一区二区三区久久,国产福利一区二区三区在线视频,日本一区二区三区影视

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
久久久久国产精品熟女蜜臀| 国产精品一区二区30p| 午夜在线观看视频在线观看| 日韩精品高清在线观看| 国产精品亚洲А∨天堂网不卡| 久久久久久精品无码免费看| 国产精品一区二区无久久久| 亚洲午夜久久久久噜噜噜| 亚洲免费电影一区二区| 国产一级二级三级精品| 国产亚洲视频中文字幕97精品| 丰满少妇高潮一区二区| 激情文学五月婷444| 中文字幕亚洲日韩欧美色| 亚洲一区二区三区中文字幕一本| 国产精品亚洲欧美日韩一区在线| 国产精品18禁久久久久久久久| 亚洲欧美日韩一区二区搜索| 91狠狠人妻久久久久久综合| 日本色一区二区三区四区五区| 9久久99久久久免费精品然| 国产h视频在线播放| 日韩特黄特刺激午夜毛片| 欧美日韩一区二区中文字幕| 88国产精品视频一区二区三区| 亚洲国产精品一区二区三区久久| 国产精品综合久久久久久| 日韩在线|中文字幕| 99久久无色码中文字幕人妻| 成人毛片女人18免费片| 午夜影院网站免费观看| 欧美老熟女多毛茸茸| 99久久免费精品国产免费高清| 久久免费少妇高潮视频| 日本淫片一区二区三区| 国产目拍亚洲精品一区二区| 久久久久成人精品免费播放寂寞少妇| 国产一级精品无码免费视频| 欧美大片在线免费看精品一区| 久久久久国产精品熟女蜜臀| 99精品国产一区二区青青性色|